Defective workmanship expert witness for construction defect disputes773-619-1226 | paul@expertwitness.co

Homebuilding and Remodeling Disputes

Residential Workmanship Defects

Residential workmanship defects arise in new homes, additions and remodels when installed work does not meet the contract, plans, adopted code or manufacturer instructions. Paul Gaston investigates each alleged defect for homeowners, builders, remodelers, insurers and their attorneys, and documents what is supported, what has another cause and what correction requires.

Typical Residential Defect Allegations

  • Framing conditions that show up as uneven floors, out-of-plumb walls and binding doors
  • Trim, casing, base and crown with open joints or poor fastening
  • Cabinet installation out of level, poorly scribed or inadequately secured
  • Drywall with visible seams, ridging and fastener pops
  • Flooring that cups, gaps, squeaks, cracks or lifts
  • Doors, windows and hardware that do not operate properly
  • Water entry related to how components were installed
  • Incomplete punch list items after closing or final payment

New Homes and Production Builders

New home disputes often involve many similar homes built by the same crews. A defect that appears in one home may appear in others, or it may be unique to one lot. Paul looks at whether a condition reflects a repeated installation practice or an isolated problem. Builders' warranty documents, performance standards referenced in the purchase agreement, and inspection records are reviewed alongside the plans and the field conditions.

Remodeling and Additions

Remodeling adds a complication new construction does not have: existing conditions. An addition has to tie into an older structure; a kitchen remodel has to work with existing floors and walls that may not be level or plumb. A competent remodeler identifies those conditions and accounts for them. Paul evaluates whether the remodeler did so, and whether the conditions complained of were caused by the new work, the existing building or the connection between the two.

Water-Related Residential Defects

Water damage in a home often prompts a defect claim. Paul evaluates the installation of the components involved, such as flashings, sealants, thresholds, tile assemblies and finish materials, and whether their installation allowed water entry. He separates that question from plumbing failures, maintenance issues and weather events. He does not offer mold health opinions or engineering analysis of building envelope performance; where those are needed he will say so.

Working With Homeowners and Builders

Homeowners can call Paul directly for an initial conversation about whether their concerns appear to involve defective work. Builders and remodelers can retain him through counsel to evaluate a claim. Either way, the investigation is the same: what was required, what was built, and what the evidence shows. Defect matters Paul has worked on include residential construction cases in Will County, Illinois, and Gillette, Wyoming. Related pages: defective carpentry and finishes and incomplete construction work.

Questions

Common Questions

Can a homeowner hire Paul without an attorney?

A homeowner can contact Paul for an initial discussion. If the matter is likely to be litigated, he will recommend involving an attorney so the engagement is structured properly.

Does Paul look at whether a defect repeats in other homes?

Where the evidence allows, yes. Repeated conditions across homes built by the same crews can indicate an installation practice rather than an isolated problem.

How are existing conditions handled in remodeling disputes?

Paul evaluates whether the remodeler identified and accounted for existing conditions, and whether the problem lies in the new work, the existing building or the connection between them.

Does Paul give opinions on mold in homes?

He addresses how installed components may have allowed water entry. He does not give mold health or toxicology opinions.

Need to know whether the work is actually defective?

Send the party names for a conflict check. Paul will look at what was required, what was built and what the evidence shows.